TH EN

Municipal Solid Waste Power Generation
Business Group

Thachang Energy Solution Company Limited (TES SKW)
Thachang Energy Solution (Ratchaburi) Company Limited (TES RBR)
Thachang Energy Solution (Chumphon) Company Limited (TES CPN)
Thachang Energy Solution (Chainat) Company Limited (TES CNT)
Thachang Energy Solution (Thachin) Company Limited (TES TCN)

Municipal Solid Waste Power Generation
Business Group

The municipal solid waste power generation have been already selected by relevant Local Administration Organizations and awaited the Energy Regulatory Commission (ERC) to purchase electricity and enter into PPA contracts. The said power plants are

  • TES SKW in Sa Kaeo: 8.0 MW
  • TES RBR in Ratchaburi: 8.0 MW
  • TES CPN in Chumphon: 6.0 MW
  • TES TCN in Thachin 9.9 MW
  • TES CNT in Chainat 8.0 MW

The total installed production capacity is 39.9 megawatts (30 megawatts for sale to PEA). The main raw material of the municipal solid waste power generation is solid wastes, which the company has contracted to dispose of with Local Administration Organizations and the community in the surrounding area.

TES RBR (Ratchaburi)
The installed capacity is 8.0 MW

Municipal Solid Waste Power Generation
Business Group

The municipal solid waste power generation have been already selected by relevant Local Administration Organizations and awaited the Energy Regulatory Commission (ERC) to purchase electricity and enter into PPA contracts. The said power plants are

  • TES SKW in Sa Kaeo: 8.0 MW
  • TES RBR in Ratchaburi: 8.0 MW
  • TES CPN in Chumphon: 6.0 MW
  • TES TCN in Thachin 9.9 MW
  • TES CNT in Chainat 8.0 MW

The total installed production capacity is 39.9 megawatts (30 megawatts for sale to PEA). The main raw material of the municipal solid waste power generation is solid wastes, which the company has contracted to dispose of with Local Administration Organizations and the community in the surrounding area.

TES SKW (Sa Kaeo)
The installed capacity is 8.0 MW

Municipal Solid Waste Power Generation
Business Group

The municipal solid waste power generation have been already selected by relevant Local Administration Organizations and awaited the Energy Regulatory Commission (ERC) to purchase electricity and enter into PPA contracts. The said power plants are

  • TES SKW in Sa Kaeo: 8.0 MW
  • TES RBR in Ratchaburi: 8.0 MW
  • TES CPN in Chumphon: 6.0 MW
  • TES TCN in Thachin 9.9 MW
  • TES CNT in Chainat 8.0 MW

The total installed production capacity is 39.9 megawatts (30 megawatts for sale to PEA). The main raw material of the municipal solid waste power generation is solid wastes, which the company has contracted to dispose of with Local Administration Organizations and the community in the surrounding area.

TES CPN (Chumphon)
The installed capacity is 6.0 MW

Municipal Solid Waste Power Generation
Business Group

The municipal solid waste power generation have been already selected by relevant Local Administration Organizations and awaited the Energy Regulatory Commission (ERC) to purchase electricity and enter into PPA contracts. The said power plants are

  • TES SKW in Sa Kaeo: 8.0 MW
  • TES RBR in Ratchaburi: 8.0 MW
  • TES CPN in Chumphon: 6.0 MW
  • TES TCN in Thachin 9.9 MW
  • TES CNT in Chainat 8.0 MW

The total installed production capacity is 39.9 megawatts (30 megawatts for sale to PEA). The main raw material of the municipal solid waste power generation is solid wastes, which the company has contracted to dispose of with Local Administration Organizations and the community in the surrounding area.

TES CPN (Thachin)
The installed capacity is 9.9 MW

Municipal Solid Waste Power Generation
Business Group

The municipal solid waste power generation have been already selected by relevant Local Administration Organizations and awaited the Energy Regulatory Commission (ERC) to purchase electricity and enter into PPA contracts. The said power plants are

  • TES SKW in Sa Kaeo: 8.0 MW
  • TES RBR in Ratchaburi: 8.0 MW
  • TES CPN in Chumphon: 6.0 MW
  • TES TCN in Thachin 9.9 MW
  • TES CNT in Chainat 8.0 MW

The total installed production capacity is 39.9 megawatts (30 megawatts for sale to PEA). The main raw material of the municipal solid waste power generation is solid wastes, which the company has contracted to dispose of with Local Administration Organizations and the community in the surrounding area.

TES CNT (Chai Nat)
The installed capacity is 8.0 MW